R-PMS Requirements : Package . Pavement Project Selection Processes : Requirement . Provide Data or Interface to Feed the Priority Formula : Requirement
Requirement - Generate Remaining Pavement Life Attribute
link
| Properties |
| Name | Value | ||||||||
| Description |
The solution must generate the remaining pavement life based on the pavement condition data, deterioration models, and Priority Formula selected segmentation (the current process is a Monte Carlo Simulation methodology). |
||||||||
| Transit To |
|
||||||||
| Id | R-PMS 3.3.1 | ||||||||
| Stereotypes | PPF - Analysis Req | ||||||||
| Attributes |
| Name | Type | Value | |||
| Text | Text | ||||
| ID | Text | R-PMS 3.3.1 | |||
| Source | Text | ||||
| Kind | Ad Hoc Enumeration | Functional | |||
| Model | Model Element | ||||
| Risk | Ad Hoc Enumeration | High | |||
| Verify Method | Ad Hoc Enumeration | Demonstration | |||
| Tag | Ad Hoc Enumeration | M-Mandatory | |||
| Appears In |
| Diagram | |||
|
|
|||