R-PMS Requirements : Package . KDOT Highway Inventory Systems Integration : Requirement . Interface with KDOT implementation of Roads and Highways called K-Hub : Requirement
Requirement - Use K-Hub Interface to update PMS highway network and LRS
link
| Properties |
| Name | Value | ||||||||
| Description |
The vendor must work with KDOT to develop a new interface between KDOT's Inventory System (KHUB) and the PMS noting that PMS uses a Centerline Network with a defined county-based LRSm and the Inventory system uses a carriageway county-based LRSm. This interface should allow the PMS to read data from KHUB for reference matching. |
||||||||
| Transit To |
|
||||||||
| Id | R-PMS 6.1.1 | ||||||||
| Stereotypes | K-HUB Integration Req | ||||||||
| Attributes |
| Name | Type | Value | |||
| Text | Text | ||||
| ID | Text | R-PMS 6.1.1 | |||
| Source | Text | ||||
| Kind | Ad Hoc Enumeration | Functional | |||
| Model | Model Element | ||||
| Risk | Ad Hoc Enumeration | Medium | |||
| Verify Method | Ad Hoc Enumeration | Test | |||
| ReqType | Ad Hoc Enumeration | D-Desireable | |||
| Appears In |
| Diagram | |||
|
|
|||